Production & Operations Intelligence

The schedule breaks at the first breakdown

One solver for allocation and sequencing, schedule repair when a line stops, and shortfalls caught before they reach the line.

Green glass bottles travelling along winding conveyors on a bottling line
The business problem

What goes wrong today

The production plan is a spreadsheet that a planner rebuilds every week and patches by phone every day.

Volume is split across lines, plants and co-packers by hand, juggling MOQ, truck fill and changeovers. When a machine stops or a rush order lands, nobody can say quickly what moves and what will be late.

Material shortfalls surface when the line is already waiting. The PO is raised late and chased by phone, and the supplier's dispatch status is a guess. Downtime is reported at month end and argued about, so the same loss repeats.

Why existing approaches fall short

  • ERP production planning assumes fixed lead times or unlimited capacity, so its schedule is out of date at the first breakdown.
  • Spreadsheet sequencing cannot weigh changeover cost, MOQ and truck fill together across many lines and vendors.
  • OEE dashboards report the loss after the fact, without the cause chain or the next decision.
The FLX4 approach

How FLX4 addresses it

  1. OpsNest uses one optimization model to split demand across lines, plants and co-packers within MOQ, truck-fill, changeover and capacity limits, and explains each split. A stage-by-stage scheduler with shift calendars repairs the plan when something changes. It locks the near term, moves only the affected jobs, and shows which jobs moved and which are now late before anyone accepts it.

  2. A nightly check compares scheduled consumption with stock and open POs and drafts a PO for any shortfall. Downtime events arrive by file or webhook and feed OEE, a loss tree and anomaly flags with their evidence. A root-cause engine builds a cause chain that cites the events behind it. Industry packs add mill grade changes and deckle trim, sewing-line balance, and FMCG batch and shelf-life rules.

  3. An approved schedule revision is written back to the plan of record. FLX4 never writes to a machine or a control system.

Operational workflow

The loop, step by step

  1. 1 · Predict

    Read the floor

    Downtime and machine events arrive by file or webhook. OEE and the loss tree update by line and shift, and each anomaly carries its evidence or abstains.

  2. 2 · Predict

    See the shortfall

    Scheduled consumption is compared with stock and open POs, so a material gap is visible before the line waits for it.

  3. 3 · Decide

    Re-solve with trade-offs

    The solver re-allocates within MOQ, truck-fill, changeover and capacity limits. A what-if repair shows which jobs move and which become late.

  4. 4 · Approve

    Planner and procurement sign off

    Schedule changes and shortfall POs wait in the approval inbox. The procurement head approves allocation runs, and POs route by value.

  5. 5 · Execute

    Drafts land where they belong

    An approved shortfall becomes a draft PO, and the supplier acknowledges it in the vendor portal. ERP posting is configured per deployment.

  6. 6 · Learn

    Trace the cause

    Root-cause chains cite the events behind them, and every proposal, approver and outcome stays on the audit trail.

Expected outcomes

What it helps you work toward

Outcomes are measured against a baseline we agree with you in writing.

Less time lost to changeovers

Changeover hours per line per week, from the schedule and the event log

Shortfalls caught early

Material gaps flagged before the scheduled consumption date, and how far ahead

Losses ranked by cause

OEE and downtime by reason, by line and shift, against the first month of data

A steadier schedule

Jobs moved and jobs made late per approved revision

Products and integrations

What powers this solution

Integrations

The weekly master production schedule (Excel), machine downtime events (CSV or webhook) and master-data files load directly. ERP connectors (e.g. SAP PP, MM and QM) are configured per deployment. Machine-data feeds such as OPC-UA or MQTT connect through a site adapter. Nothing writes to a control system.

Industries

Bring us the decision behind this problem

In two weeks: the decision mapped, where money leaks, a baseline agreed in writing and a ninety-day plan with one target.

Discuss your supply chain challenge

Read-only on day one. Your people approve every action. If the number does not move, you do not scale.